logo

Strategic and Performance Management

Areas of activities:

Strategic planning, Implementation and develop strategic transformation plan, design and develop business models, formulating a business plan, design a performance management and Evaluation system, Preparation of development Documents


Projects:

1. Strategic planning in S.G.C.C co

2. Study on the creation of a special mining technologies corridor in the Bafq city

3. Study on the creation of a special science and technology area in the Yazd

4. value chain Strategic Analysis in the selected industries in Yazd

A) CFLs industry

B) jewelry industry

C) LED Industry

5. Provide of declaration based EFQM model

A) Rural Water and Wastewater Company of Yazd Province (two courses)

B) Water and Wastewater Company of Yazd Province

C) Roads and Transportation Department in Yazd province

D) Sewage Company of Tehran

6. Improve of Methods to processes performed on the client:

A) Management and Planning Organization of Yazd province

B) Deeds and Properties Registration Organization of Yazd province

C) Foundation of martyrs and veterans affairs of Yazd

7. Troubleshooting training / Armin MACARON

8. Review and reform of processes / ZAVIR Co.

9. Redesign of document management system / irandoc Center

10. Redesign of Statistics and Information Department / Management and Planning Organization of Yazd

11. Optimize of administrative spaces/ general government of FARS

12. Principles of designing the performance model of the cultural centers/ High Council of Cultural Revoulution

13. Design of performance information system/ Institute of standard and industrial research of Iran

14. Design of research performance evaluation system/ Ministry of science, research, and technology system/Yazd water and Sewage co.

15. Reengineering processes posture of the cultural management Process

16. Reengineering of administrative processes /Yazd Welfare Organization

17. Study of affecting productivity factors to provide an optimal model of choosing the electric engines

18. Preliminary studies and evaluation situation /Y.A.H.A CO

19. Survey of methods to put confidence in standard signet

20. The cost price Project of activities /Agriculture Organization of Yazd

21. Implement of processes privatization project / Agriculture Organization of Yazd

22. Prepare of Select package provided cold water meter

23. Prepare of selecting electric engine software package

24. Prepare of performance assessment software package

25. Prepare of administrative documents management software package

26. Choose the Optimal water meter /Yazd water and wastewater co