Strategic and Performance Management
Areas of activities:
Strategic planning, Implementation and develop strategic transformation plan, design and develop business models, formulating a business plan, design a performance management and Evaluation system, Preparation of development Documents
Projects:
1. Strategic planning in S.G.C.C co
2. Study on the creation of a special mining technologies corridor in the Bafq city
3. Study on the creation of a special science and technology area in the Yazd
4. value chain Strategic Analysis in the selected industries in Yazd
A) CFLs industry
B) jewelry industry
C) LED Industry
5. Provide of declaration based EFQM model
A) Rural Water and Wastewater Company of Yazd Province (two courses)
B) Water and Wastewater Company of Yazd Province
C) Roads and Transportation Department in Yazd province
D) Sewage Company of Tehran
6. Improve of Methods to processes performed on the client:
A) Management and Planning Organization of Yazd province
B) Deeds and Properties Registration Organization of Yazd province
C) Foundation of martyrs and veterans affairs of Yazd
7. Troubleshooting training / Armin MACARON
8. Review and reform of processes / ZAVIR Co.
9. Redesign of document management system / irandoc Center
10. Redesign of Statistics and Information Department / Management and Planning Organization of Yazd
11. Optimize of administrative spaces/ general government of FARS
12. Principles of designing the performance model of the cultural centers/ High Council of Cultural Revoulution
13. Design of performance information system/ Institute of standard and industrial research of Iran
14. Design of research performance evaluation system/ Ministry of science, research, and technology system/Yazd water and Sewage co.
15. Reengineering processes posture of the cultural management Process
16. Reengineering of administrative processes /Yazd Welfare Organization
17. Study of affecting productivity factors to provide an optimal model of choosing the electric engines
18. Preliminary studies and evaluation situation /Y.A.H.A CO
19. Survey of methods to put confidence in standard signet
20. The cost price Project of activities /Agriculture Organization of Yazd
21. Implement of processes privatization project / Agriculture Organization of Yazd
22. Prepare of Select package provided cold water meter
23. Prepare of selecting electric engine software package
24. Prepare of performance assessment software package
25. Prepare of administrative documents management software package
26. Choose the Optimal water meter /Yazd water and wastewater co

